PMP美国项目管理认证考试的模拟题精选10

日期:12-12| http://www.59wj.com |项目管理师考试|人气:670

PMP美国项目管理认证考试的模拟题精选10 qustions 1: 
a change control system should include all the following except- 

a.  procedures for automatic approval of defined categories of change 
b. paperwork, tracking systems, and approval levels necessary for authorizing changes 
c. a description of the powers and responsibilities of the change control board 
d. procedures for conducting a midproject control system review 

qustions 3: 

two fundamental objectives of project control are to-- 

a.  alter activities to achieve results and manage organizational assets 
b. eliminate unexpected technical problems and identify technical difficulties that require more resources 
c. ensure that resources are available when needed and avoid increases in the scope of work 
d. have the required material, personnel, and equipment available when needed and ensure that budgeting is adequate 

qustions 5: 

the project plan is important in change control because it-- 

a.  provides the baseline against which changes are managed 
b. provides the information on project performance 
c. alerts the project team to issues that may cause problems in the future 
d. is expected to change throughout the project 

qustions 2: 
written changes orders should be required on -- 

a. all projects, large and small 
b. large projects 
c. projects with a formal configuration management system in place 
d. projects for which the cost of a change control system can be justified 

qustions 4: 

the principal sources of project failure are- 

a. lack of a projectized or strong matrix structure, poor scope definition, and lack of a project plan 
b. lack ofmitment or support by top management, disharmony on the project team, and lack of leadership by the project manager 
c. poorly identified customer needs, a geographically dispersed project team, and littlemunication with the customer until the project is delivered 
d. organizational factors, poorly identified customer needs, inadequately specified project requirements, and poor planning and control 

qustions 6: 

interface management is -- 

a.  considered to be one of the easier aspects of implementing the project plan 
b.  primarily concerned with the technical issues associated with linking systemponents in a configuration 
c.  facilitated by use of the wbs to display the ways people on the project interact and their duties and responsibilities 
d.  the process of coordinating the various elements of the project so that they meet their joint goals of performance, schedule, and budget 如果觉得《PMP美国项目管理认证考试的模拟题精选10》项目管理师考试,项目管理师考试试题,历年项目管理师考试真题不错,可以推荐给好友哦。
本文Tags: 职业资格考试 - 项目管理师考试,项目管理师考试试题,历年项目管理师考试真题,
在百度中搜索相关文章:PMP美国项目管理认证考试的模拟题精选10
在谷歌中搜索相关文章:PMP美国项目管理认证考试的模拟题精选10
在soso中搜索相关文章:PMP美国项目管理认证考试的模拟题精选10
在搜狗中搜索相关文章:PMP美国项目管理认证考试的模拟题精选10
相关分类导航|
热门推荐|